Starvo Express charging station at Pertamina Fatmawati

Express · Charging at urban businesses

Fast charging for busy urban locations.

Two 100 kW DC fast-charging bays on a compact 200 m² site. Express suits restaurants, fuel stations, and retail locations. One example is the Starvo station developed with partners at Pertamina Fatmawati.

Express Configuration

Fast charging for compact sites.

The Express tier is built for a minimal footprint while still delivering fast charging. Ideal for site owners who want to add a charging amenity without a major land redesign.

Specifications

Chargers
2 × DC fast 100 kW
Simultaneous charging bays
2 bays (2× CCS2)
Total power
200 kW
Minimum site area
200 m²
Compatible hardware
Compact DC 30/40 kW or DC 120 kW, depending on grid capacity

Ideal For

Where Express fits.

  • Fuel stations with EV traffic

    Pertamina, Shell, BP, or independent fuel stations introducing EV charging. Shared branding can help drivers recognise the location from the road.

  • Restaurants and cafés

    Restaurants, cafés, or bakeries where customers stay for 30–60 minutes. Visitors can charge while they stop.

  • Convenience stores

    Indomaret, Alfamart, or standalone minimarkets in strategic spots. Add an EV amenity without changing the retail floor.

  • Shophouse strip malls

    Rows of shops with parking at the front. Express can turn part of that parking area into EV charging bays.

  • Apartments with limited space

    Apartments with 100–300 units that want to add EV charging facilities on a compact site.

  • Mid-size offices

    Office buildings of 1,000–3,000 m² floor area. A charging amenity for employees and visitors.

Project example

Starvo at Pertamina Fatmawati.

Starvo Express charging station at Pertamina Fatmawati

Pertamina Fatmawati

A Starvo charging station developed with partners at the Pertamina Fatmawati fuel station in South Jakarta. The project was delivered with Pertamina Patra Niaga under an active cooperation agreement.

Planning a charging station on a 200 m² site?

Estimated development time for Express is 3–4 months from the MoU. Discuss site readiness and your project schedule with Starvo.

Consult via WhatsApp

FAQ

Frequently asked questions

What is the Express tier?

A compact charging-station concept for urban businesses, with two 100 kW DC fast-charging bays on a site of around 200 m².

What locations is it suited for?

Restaurants, cafés, fuel stations, and retail locations in busy urban areas.

How much land does it need?

Relatively little, around 200 m² — ideal for sites that aren't very large.

Can the station be expanded?

Scale can be adjusted as demand grows; we help map it out during the site survey.