Initial Phase
Sk-MIN- Chargers
- 6 × DC ultra-fast 120 kW
- Simultaneous charging bays
- 12 (2× CCS2 per unit)
- Total power
- 720 kW
- Minimum site area
- ±1,000 m²
- Estimated development time
- 5 months

Prime · Charging for commercial locations
Each Prime station can have 6–18 DC chargers, each rated at 120 kW, with a canopy and lighting for user comfort. Capacity can grow with demand. Mega Kuningan in Jakarta is one example of a Prime location.
Prime Configuration
Prime can be developed in stages, from 6 to 18 chargers. Each unit has two CCS2 connectors. Future additions should be considered when planning the site layout.
Station infrastructure
A white PVDF membrane on a steel structure. The Starvo logo prominent up front, visible from the main road.
Warm white LED under the canopy, accent lighting at each charger. Safe and welcoming for night-time charging.
International standard, accommodating mid-size SUVs down to sedans. Reflective paint markings for navigation.
Medium-voltage (MV) connected directly to a dedicated transformer. Not shared with other tenants' loads.
Real-time monitoring integrated with the Starvo Command Center. Incidents tracked and responded to within SLA.
Compliant with DKI Governor Regulation 31/2022, RDTR-compliant K2 zoning. Active ESDM SPKLU operator license.
Project examples

Jakarta business district · Sk-MIN (6 chargers), being developed towards Sk-MAX (18 chargers), with support for 9+ EV brands.

Mega Kuningan · A charging station in a business park, with access to the lobby and food and drink facilities.
In an initial consultation, we review your site area, electrical capacity, and potential charging demand. The consultation is free, with no commitment required.
Consult via WhatsAppFAQ
A commercial charging-hub concept with 6–18 DC chargers per station, each rated at 120 kW.
Around 1,000–2,000 m², depending on the number of bays built.
Yes. You can start with 6 chargers and expand to 18 while retaining the basic site layout.
Office districts, shopping centres, hotels, and other commercial locations. Prime has been implemented at Mega Kuningan and Grand Rubina.