Starvo Ultimate with multiple EV charging bays

Ultimate · Intercity charging hub

A charging hub for high-capacity locations.

Thirty 120 kW DC chargers on a site of 3,000+ m², supported by a dedicated PLN substation and transformer. Ultimate is designed for airports, rest areas, and locations with high charging demand along intercity routes.

Ultimate Configuration

Large capacity, carefully planned.

Ultimate requires a large site and substantial electrical capacity. The configuration is planned around vehicle numbers, visiting patterns, and charging demand.

Specifications

Chargers
30 × DC ultra-fast 120 kW
Simultaneous charging bays
60 (2× CCS2 per unit)
Total power
3,600 kW
Minimum site area
3,000+ m²
PLN supply
Dedicated substation + large transformer

Ultimate infrastructure

The components of a high-capacity charging hub.

  • Medium-voltage PLN substation

    A dedicated substation with a 20kV → 380V step-down transformer. Capacity sufficient for the peak load of 60 simultaneous bays.

  • Large-span architectural canopy

    A heavy-duty steel structure with a 30+ meter span. White PVDF membrane or zinc-aluminum profile, design coordinated with the landlord's brand.

  • Multi-lane layout

    60 charging bays arranged in parallel or angled rows. Clear markings guide traffic in and out, with space for vehicles from sedans to pickup trucks.

  • Customer waiting area

    A waiting area with seating, toilets, and food and drink facilities, designed for customers making a 30–60 minute charging stop.

  • Easy to find from the road

    Lighting and Starvo signage help drivers identify the charging hub from the main road.

  • Room for expansion

    The substation is dimensioned with 30% headroom. The bay layout accommodates future upgrades to 250-400 kW charging.

Project planning

Currently in negotiation.

Soekarno-Hatta AirportNegotiation Stage

Proposed charging stations at T1, T2, and T3. Site plans and 3D visualisations are available for review during discussions with Angkasa Pura, a Starvo partner with a history of formal cooperation.

A 3,000+ m² site with high grid capacity?

Ultimate requires a feasibility review. Discuss the site, electrical capacity, and expected charging demand with Starvo.

Discuss your project

FAQ

Frequently asked questions

What is the Ultimate tier?

An intercity charging-hub concept with up to thirty 120 kW DC chargers per station.

How much land and power does it need?

A 3,000+ m² site with a dedicated PLN substation to support the large capacity.

What locations is it for?

Airports, toll-road rest areas, and charging hubs in areas with high vehicle traffic.